Stockholms RoofingStockholms Roofing
Loft Insulation in Cheshire
Approved roofers in Cheshire

Loft Insulation Specialists in Cheshire.

  • Over 15 Years Experience
  • 800+ Jobs Completed Across the North West
  • Prices Start From £450
Call Now
5.0 Google Rating10-Year Workmanship WarrantyHassle Free Quote
  • BBA-Approved Materials

    Welsh slate, Marley, Tyvek and VELUX. Manufacturer-backed cover up to 75 years on tile.

  • Senior Roofer, Quote To Install

    The roofer who quotes your work runs the install. The number you ring is the number you get.

  • Insurance-Backed 10-Yr Warranty

    Workmanship warranty plus manufacturer cover. Honoured even if we one day stopped trading.

  • 06:00 to 20:00, Every Day

    Seven days a week. Urgent leak callouts attended within 48 hours where we can.

Service spec

Loft Insulation · what you get

Materials we run

  • ·Knauf mineral wool 270mm
  • ·Rockwool
  • ·Foil-backed insulation board

Warranty

  • 5-year workmanship guarantee
  • Manufacturer cover 25 to 50 years
  • Insurance-backed via FMB

Lead time

1 to 2 weeks

Indicative pricing

From £450 typical loft

Free inspection · No-obligation quote

Loft Insulation pricing

Indicative ranges based on the work we do most weeks. Every quote is written, itemised, and fixed before we lift a tile.

From £450 typical loft

Free inspection · No-obligation quote · Materials and warranty included

What our customers say

From start to finish the service was outstanding. Professional, reliable and great communication. Highly recommend Stockholms Roofing!

James R.

Excellent workmanship and very honest advice. They went above and beyond and the roof looks fantastic. Thank you!

Sarah M.

Quick response, fair price and quality work. Will definitely use again and recommend to anyone.

Daniel W.

Recent loft insulation in Cheshire

CW1

Full mineral wool install to bare joists, Crewe

New-build top-up where the developer had only put down 150mm. Stripped existing, fitted Knauf 270mm, plus rigid foil-backed board over part of the loft for boarded storage.

Scaffold
No external scaffold required
Duration
2 working days
Materials
Knauf mineral wool 270mm, Foil-backed insulation board, Loft boarding

Roofing in Cheshire

What we see on roofs in Cheshire

Cheshire is wider and older than Chester, and the work changes accordingly. The black-and-white timber-and-render stock around Tarporley, Tattenhall and Bunbury usually carries hand-made clay pantile or Welsh slate set on heavy oak rafters. Listed-building constraints sit on a lot of these properties: for materials, for scaffold detail, sometimes for the time of year work can be done. We have handled Cheshire West and Chester planning conditions and Cheshire East planning conditions enough times to know where the gates are.

Crewe, Northwich and Macclesfield run on a different stock: rail-town Victorian terrace in Crewe, mill-town tile in Macclesfield, and a mix of mid-century and modern detached around Knutsford and Wilmslow. Estates around Frodsham and Helsby sit on exposed elevation up against the Mersey marshes, where prevailing wind drives leak risk into the verges and the chimney flashings well before the field tiles. Ellesmere Port and Runcorn are heavier on flat-roof work: a lot of mid-century commercial-and-residential mix, plus 1970s estate stock with low-pitch concrete that is at end-of-life and going across to EPDM rubber as a one-day strip-and-recover where the deck is sound.

Across Cheshire our standard residential job runs five to seven working days. The Chester Team covers the county on 01244 879719.

Loft insulation across Cheshire splits between standard upgrade work on modern estate stock and the more careful specification needed on the county's period properties. Knutsford and Wilmslow large-detached houses with good loft access and standard trussed-rafter construction are a straightforward 270mm mineral wool job. Tarporley and Tattenhall period properties with cut-rafter roofs on oak frames need a breathable specification as standard: the original lime-plastered ceiling below is a hygroscopic layer that needs to dry upward, and sealing it under a VCL and mineral wool sandwich traps moisture. We use ThermoFloc or Warmcel blown-in cellulose on those properties. Macclesfield and Crewe terrace stock is eligible for ECO4 grant funding in a significant proportion of cases and we carry the eligibility check paperwork on every call. Chester Team covers all of Cheshire.

A poorly insulated loft is the single easiest heat loss to fix on a typical UK semi or detached house. Heat rises, and if there is less than 270mm of mineral wool between the ceiling joists and the cold air above it, you are heating the street as much as the house. Building Regs Part L sets 270mm as the minimum for new work; EcoFlex recommend 400mm for optimal thermal performance. Most pre-2000 houses in the L, CH, LL and WA postcode areas are sitting on 100mm or less.

We fit glass mineral wool (Isover or Knauf), rigid PIR board (Kingspan TP10 or Recticel Eurothane), or a combination of both depending on the loft type. Cold lofts, warm lofts, cut-rafter roofs, and trussed-rafter roofs all have different requirements. We assess which is appropriate before quoting.

What we fit and why

For a standard cold loft on a trussed-rafter roof, the spec is two layers of Isover or Knauf glass mineral wool: 100mm between the joists and 170mm across the top at 90 degrees, giving the 270mm minimum. Rolling the second layer at right angles avoids the thermal bridging that single-layer installs let through at the joist position.

For warm loft conversions where the insulation goes between and below the rafters, we fit Kingspan TP10 or Recticel Eurothane rigid PIR board. PIR achieves a lower U-value per millimetre than mineral wool, which matters when rafter depth is limited. On a 100mm rafter, 90mm PIR between and 50mm PIR below achieves Part L compliance; the same performance with mineral wool is not physically possible in that depth.

Ventilation and vapour control

Cold-loft insulation must leave a minimum 50mm clear airspace between the top of the insulation and the underside of the roof covering to allow air movement. This is not optional; without it, condensation builds on the cold timber and you trade heat loss for a rot problem. We check the eaves ventilation before laying and advise on any remedial ventilation work needed.

Warm-rafter insulation requires a vapour control layer on the warm side of the insulation to stop interstitial condensation forming within the rafter depth. We install Intello or Pro Clima VCL taped at all joints and laps. This is frequently missed on retrofit installations and is the cause of most premature degradation in warm-rafter insulation systems.

What it costs

Cold loft insulation at 270mm on a standard three-bedroom semi typically runs between £400 and £700 plus VAT, including clearing and reinstating loft boards where access is needed. Warm rafter insulation as part of a loft conversion scope is included in the conversion quote. Standalone warm rafter retrofits are quoted on survey as they depend heavily on rafter depth, roof area and access.

What we back it with

All insulation work carries a 5-year workmanship guarantee. Mineral wool is guaranteed inert for 50 years by Isover and Knauf. PIR board carries a 25-year thermal performance guarantee from Kingspan. We also provide a Part L compliance certificate for any insulation that forms part of a building regulations submission.

Approved Installer

  • British Board of Agrément approved installer
  • Marley approved roofing installer
  • VELUX certified roof window installer
  • Andura approved roof coating applicator
  • CURE IT GRP fibreglass approved installer
  • Euroclad approved cladding and roofing systems installer
  • Firestone EPDM rubber roofing approved installer

How we work

Six clear steps from first call to finished roof. Designed to remove every common surprise.

  1. 01

    Call, text or email

    Tell us what you need. We pick up between 06:00 and 20:00, seven days a week.

  2. 02

    Arrange a date

    We agree a time that works for you. No pressure, no chase calls.

  3. 03

    Free roof inspection

    A senior roofer attends, gets up the ladder, and checks every detail in person.

  4. 04

    Honest, best advice

    We tell you what really needs doing, what can wait, and what we would skip.

  5. 05

    Clear quote, no hidden costs

    Itemised, written, fixed. The price you see is the price you pay.

  6. 06

    Quality work, built to last

    BBA-approved materials, manufacturer-backed warranties, our 10-year workmanship guarantee.

Why choose us

Why choose Stockholms Roofing for loft insulation in Cheshire

Roofers your neighbours actually call back. We answer 06:00 to 20:00, seven days a week, across Cheshire and the surrounding postcodes.

  • BBA-Approved Installer
  • 5.0 Google Rated
  • 06:00 to 20:00, Every Day
  • Free Site Inspections
  • 10-Year Workmanship Warranty
  • Fully Insured Cover
  • Marley and VELUX Approved
  • Same Team, Quote To Install

Frequently asked

5.0 Google Rating

Ready when you are

Phone, WhatsApp, or quote form. We answer every contact between 06:00 and 20:00, seven days a week.

Call NowWhatsApp
Call WhatsApp